9/12/2008

Summer Vacation Series- Randy Epstein

Randy says he been keeping the trains running over the summer, and added a few additions to the locomotive fleet......here are a few shots!


Summer Vacation Series- John "Cully" Cullinan

Channel 13 hires freelance mobile TV cameraman ( Tony Bucca) at the east portal last Friday, chasing the Pan Am slurry train. Cully says,"I didn't mean to wake him up, he was "oogling" the female kayakers and rafters. He claims the van has all the comforts of home, but it seems to be missing a "bidet". Caught him fluffing his pillow and warned him about the approaching slurry train!".


VRS 301-303 at North Hoosick Bridge with slurry train

. Pan Am 380 with the slurry train through Zoar, MA.


9/10/2008

Summer Vacation Series- Mark Oliviere

We have been very busy over the summer working on my layout. Every Tuesday night we meet between 6:00 and 9:00 PM. The first picture is the beginning of the railroad yard that will be located under a mountain. We used the same technique for the roadbed that we used on the first yard. A piece of 1/4" plywood with a cork border.

The Second shows the yard nearly completed. Once completed the tracks will be adjusted so they are all straight. If you look closely you can see the jumper wires for the tracks.

The third is the beginning of the logging line that will run through the mountain When the initial logging line is built it will have 4 switchbacks.

The fourth is a close up of the approximate location of the trestle bridge for the logging line. The bridge was on my previous layout for the logging line. This bridge was built from a 2x4. The 2x4 was cut down on a large table saw then cut to size on my hobby table saw. The ties on the bridge were leftovers from the large trestle bridge that I built on my previous layout.

This is part of the mountain that is located over the second railroad yard. You can see the location of some of the switchbacks for the logging line and a small river bed next to the 2 main lines. Each section of the mountain is constructed to be modular, with sections overlapping at the joints of each module. Plastic is placed between the overlapping sections so they do not stick together.

Both main lines are up and running. Each has been tested with up to an 80 car freight. The main lines have been wired for half of the layout. On the section that is wires the train runs at a steady pace. Jumpers are places approximately every 6 foot. On the section that is not wired yet the trains slow down due to voltage drop. The section that is wired has been calculated to have a voltage drop of only 1/4 volt with 4 diesel locomotives drawing 1/2 amp each. The wire size I used to achieve this is #10 AWG. That is the same size of wire used for household dryers. The jumpers to the track are #16 AWG stranded wire (speaker wire).The DCC power pack has an output of 3.5 amps at 18 volts AC. We have had up to 5 power units running at the same time without any speed lose on the wired half of the layout. I will send you more photos later. We should have the logging line up and running by October.

Mark

8/15/2008

Nighttime Detour

Please enjoy the attached photo. August continues to be a most enjoyable month this year! First the TRAINS magazine article, now NECR detours over VRS powered by solid sets of blue & yellow GP 38's! It's been "a long time" since I have seen a solid set of NECR power on anything. So with thanks to Scott Whitney for the original heads up on Monday evening, I had my plans for week changed. Thankfully, I was in a position to drop everything for this event. The detours lasted three days/nights into Thursday morning. The first two nights became recon patrols, visiting favourite photo locations ahead of the detour, only to notice "something's wrong here"......the scene had changed for the worse, LOL! Knowing I had a third chance Wednesday night I was laughing it off when I arrived well ahead of NECR 324 at Bartonsville Covered Bridge Tuesday evening only to find one of those refrigerated box trucks parked alongside the tracks smack dab in the scene facing me! What else can you do? Wednesday evening came and armed with the knowledge that NECR 323 (the final detour) would be arriving in Bellows Falls around 18:00, I drove down to East Wallingford to where my friend Helen Fox has lived since she was eight. After knocking at the door and reaquainting ourselves at dusk, ( thankfully I remembered her name.....) I proceeded to set up and wait. With plenty of time to time to get the lighting to my satisfaction it was a couple hours before I broke out the thermos of green tea, as this is a deceiving location to light up a train at night. We're deep in Vermont here, quiet descends after dark in hill farm country, one of which is located above the tree line to the right of the photo, contributing wafts of manure odors on breezes through the night. Note the tire swing up in the tree. While I set up a family comes down to the end of their driveway behind me here to watch, hoping to see the train, one of the kids asks a parent..........."he's gonna park his car there"? Little does she realize, having delivered me here, now the "cah" is the least of my concerns, LOL! Another car arrives and conversations ensue. By eleven p.m. my tired audience disperses, disappointed. Most of the neighbors lights stay on though, as they've seen my act here before enough to stay up for the train. When I shot the P&W Johnson City coal train here, I met Mrs. Fox and told her of my plans, only to be admonished that "there are no trains here at night". On any other night Helen would have been correct! To her credit she allowed me to set-up around her house anyway that night. It was after eleven p.m. when the VRS dispatcher in Rutland broke the silence, calling the NECR 3849! Bringing a wide grin to Gary's face! A half hour later I hear an airhorn towards Mount Holly, the NECR GP 38's ARE NOT equipped with dynamic brakes, so you cannot hear them coming downgrade that well. Almost another half hour goes by as the head end closes in. It's just before midnight, as the moment is savored, NECR 3849 leads three sisters around the curve and past me at 10 mph, making it easy to pick the spot I want the head end in. A sight I have'nt seen in years, four NECR GP 38's together! WOW! Worth waiting hours for. Before departing in a glow, I shared the photo with Helen Fox, thanking her for her hospitality. What a location. eh!? Please enjoy! Comments are welcomed. Shot on August 13, 2008 at 23:59 with the 5D and Zeiss ZF 28/2 (Nikon) set at f2. Flash units erased in photoshop behind the pilot of 3849 and in front of the tree.

All The Best In 2008;
Gary

8/05/2008

Rich's Mohawk Central Summer 08

Richie Eriksen and Chris Rittner have been busy working on the Mohawk Central over the summer, enjoy the pics! MCRR SD90MAC's!

STRR C425m's.

"The lower end" and west end of the staging yard.


The lower end inustrial area facing west.

MCRR Dash 9's in patriotic colors.

MCRR RS32's, alive and well!

7/21/2008

Pow-Wow in Rotterdam Junction

Well, folks, here's my contribution from about noontime on Saturday. I was on the way to the Pow-Wow in Rotterdam Junction, had to take a ten-minute diversion to appreciate that the Pan Am paint is actually blue, and not too bad to look at when fresh, either.Here's 307 switching across Rt. 5S in difficult sun.BTW, the Pow-Wow was pretty good, too... (I'm the token German in the Indian organization) ...........Bill Mischler

7/18/2008

D&H Cohoes In N

From Bob Platel, "Here is some new pictures of my layout." RS-3 4107 preparing to switch Cohoes Wertime trestle while U23B 2316 passing thru with 2 flat & a tank car of lube oil for GE.

Cohoes swicher switching trestle.

Leased B & M RDC stopping at Cohoes passenger station.

Cohoes switcher pushing 3 boxcars of pulp to Mohawk papermill.
I am working on a model of the Cohoes freight house and will send some pictures soon. Hope to see you soon! Bob

7/10/2008

The C.R.O.C.K.S.

Here's some shots of on-going progress on the caboose- the C.R.O.C.K.S. (Citizens Restoring Our Caboose at King's Station) have been putting in a lot of hours. The siding is all up,and 4 windows have been built in place on the long sides.


I've been grinding scale rust away from the metal parts, and hope to get the cupola windows operational this month. The red is just a primer.


I'll be going to the Cooperstown and Charlotteville to get stencils saved from the Oneonta roundhouse for the logos.


7/06/2008

Fern' Power Night At Port Henry

Please enjoy the attached photo! Returning to the compound in Hinesburg after a few nights "ovah" visiting the Saint Lawrence & Atlantic, my timing was good, as I heard D&H North End Dispatcher Gordy Smith announce the new lead unit on CP 930 to be the CN 5610! YES! I get another chance at this shot! The night before I left for the SLR the 5610 ran on 930 but a car was parked here in front of the station, acceptable for sure, I shot it but.......I'd rather not see the auto! LOL! I actually pulled off sleeping well in daylight at an abandoned fly fishermans camp, now a State Park, near the SLR on the Upper Connecticut. Tent camping, on the ground, no electricity, a great swimming hole! After putting up the tent, I unrolled the new "sleeping pad" then noticed the tag....."30 min. to inflate, inflate and deflate several times before actual use". OH. Ha,ha,ha! It's safe to say I have a new appreciation for the waterbed here at the compound! BUT I now have a place from which to roam on the SLR half the distance from Hinesburg. Much more enjoyable! A word of caution for anyone who feels they must drive in Northern New Hampshire after dark......drive slow enough so you can stop well within the distance you can see. I looked up at two moose on the road ahead of me during the same night recently. The males can weigh in at a ton! They are no problem as long as you drive slow. It's one thing when you come upon moose ahead of you in the road, and it's quite another thing when moose come upon you in the road! They appear at the last second out of your side vision up close, towering! So we enjoy a rare moment back here at Port Henry, as CN 5610 makes an encore appearance. Grass mowed to enhance this view from the stepladder, thanks guys! A timeless scene with the ex-LC&M G.O.B. illuminated up on the hill, the adrenaline rush arrives as the head end slowly passes the station moving into position for the photo. Shot on July 6, 2008 at 01:41, with the 5D and Zeiss ZF 28/2 set at f2. Please enjoy! Comments are welcomed!

All The Best In 2008;
Gary

6/27/2008

Last night I celebrated!

Please enjoy the attached photo. Last night I celebrated! CP contributed to the festivities by running 252 out of Rouses Point after one thirty a.m. Knowing the lakeside bar in Plattsburgh was closed on Wed., I happily set up within the friendly confines of the station here to record 252s appearance. Translated into; no college kids under the influence walking past the lighting and making a scene. The celebration? What happened? Long time list members will recall the night photo shoot and interview of me by the highly acclaimed railroading journalist Karl Zimmerman, back in mid-October last fall. We were up at "the castle" in Lacolle. I mentioned to the list members to be looking for the resulting article in an upcoming issue of TRAINS. Karls write-up from that night will be published featuring my night photos in the Sept. TRAINS! Wait till you folks see the grand treatment my night photos received! And the writing of Karl Zimmerman! Ever want to go out with me and do one of these set-ups at night? Karls writing brings you that experience, he's the best! Shooting the last of steam in Quebec at night in the late fifties and early sixties, Karl is certainly no stranger to the night photo. Get this issue! For the few who do not have a subscription: https://secure.kalmbach.com/Offer/default.aspx?c=ITRN08

So join a glowing Gary here at Plattsburgh, after I've exchanged e-mails with TRAINS associate editor Kathi Kube and viewed the feature article earlier in the evening. It's t shirt weather, (rare) no wind, the lighting all set-up as the talking detector perhaps seven miles north of town announces the passage of 252. The Zeiss ZF 100/2 lens prefocused manually, on the 5D, in the familiar position on tripod with me atop the stepladder waiting. With a backdrop such as Plattsburghs ex-D&H Station, well........let's agree I have a lot to be grateful for these days! Even the NS power appearring on the 930/931 trains looks "good" here! But CP comes through with one of their own tonight, and as many times as I have shot this scene, it's still easy to underestimate 252s closing speed, there's no hesitating when the moment comes tonight! Please enjoy! Comments are welcomed. Please enjoy Karls article in the Sept. issue of TRAINS, you all will recognize moments we have shared in the past!

All The Best In 2008;
Gary


6/22/2008

This photo, shot on Sept. 10, 2006, benefits from being reprocessed with the new software from NIK. See what you think. It is difficult to believe it's been a year and three quarters since I visited this spot. As you might imagine I remember the two nights spent here well. Approaching westbounds headlights cause the abandoned bore to the left to glow with a ghostly yellowish light, adding to the pitch dark atmosphere in here during the middle of the night! The curved tunnel is long enough to amplify the roar of the locomotives inside before their headlights are seen as well. "Many" eastbounds had passed by me earlier in the evening here, and I suspect any westbounds they encountered later were made aware of my being set-up here awaiting their appearance at the west portal. Another very dramatic location at night, I have to get back down here this year! For those list members who are stangers to this area, State Line Tunnel is located in New York, close to the Massachusetts state line, with Canaan Center, NY being the closest town. Roughly forty five miles east of Albany. Shot at 01:58 on Sept. 10. 2006 with the 5D and Canons 100/1 lens set at f2.8. Please enjoy! Comments are welcomed.

All The Best in 2008;
Gary

6/16/2008

Lighting Stripe on the B&M

D&H 7312 heading out of the Battenkill RR interchange onto the B&M, on a rare daylight run!

The blue and grey beauty ducks under the highway bridge in Valley Falls, NY.

Thanks Cully!

5/02/2008

New ork Cent a

Picture was taken recently of a maintenance shed on the CSXT right of way in Batavia, NY. Any info on the art deco New York Central? Was it a transplant from some "modern" station? Seems like a waste to put stainless steel letters on a shed.
Armand

4/08/2008

Visit To Randy's

After a long winter break we visited Randy Epstein's this past Thursday. He he has been busy collecting new rolling stock, engines and working on some scenery.
D&H RS36's and B&M "Bluebirds" roam the hills on Randy's layout.
A new company has announced they are moving to Randy's layout and the company executives and local politicians are meeting for the official groundbreaking.
Now that's a rail yard!
Bob, Randy, John, Bill K, Dale, Bill H, Paul and myself, with Mark behind the camera. Dave and Freddie were also there. It's was a fun night!

3/04/2008

Whitehall Dreams....

The picture is from my fantasy land but not completely out of wack as the NKP 759 was here in the summer of 72. Jim Lafayette...


2/26/2008

Randy's Update

I have made some significant progress on my layout. Randy.



2/20/2008

Desert Rat In The Snow

Bound for a warmer climate. Here we find EMD export GPL15T Just one of eight Standard Gauge units that are being built by Super Steel in Glenville, NY. Under contract by EMD for SNIM (Societe Nationale Industrielle et Miniere) a Iron Ore Mining Company based in the Sarhara Desert in Mauritania Africa. SNIM was known at one time for running one of the worlds longest and heaviest constantly running trains (1.8 Miles Long). SNIM single track 434 mile rail line links four Mines in the province of Tiris a desert area of Northern Mauritania to a harbor at Nouadhibou were the ore is shipped by ship. These units are going to be shipped out of the Port of Albany on completion of order. Look forward to seeing these hiding down by the dock. Enjoy......Taken 2/14/08 by Deano

2/15/2008

West Waterford Update!

This is the only section of table that we saved from my old layout. The bridge is 522' long. 73' high. It was built with Northeast Scale lumber. The rails on the bridge are hand spiked. It took 100 hours to construct. Part of the bridge has a 32" radius.This is the beginning of the hump that I am constructing for my yard. I tried a number of different grads to determine which would be best. Cars rolling off of this hump will travels between 10' and 14'. The track on the hump is only temporary to test the turnouts. Once I have my rolling stock out I will have to work on the trucks and wheel sets.
The beginning of the railroad yard. Instead of using roadbed for each track, as I did on my last layout, I nailed down 1/4" plywood. The track crew glued down the ballast so it would be ready for the track. It is wide enough to contain 10 sidings.

Here the yard has most of the track installed. 4 tracks for the hump and 6 for storage. Thanks, Mark Oliviere.