10/07/2007

Bob Chase and Bar Mills

Stanley Stove, by Bar Mills. Followed basic kit instructions. Changed some details such as roofing material. Decided at last minute to shingle the roof instead of the rolled tar paper roof supplied. Shingles are by Rusty Stumps.

Bracing Walls against future warp-age.

Sprayed everything with a coating of Dr. Bens new Driftwood Stain, Both sides of everything. Followed by a spray of Americana French Blue, cut with normal car windshield washer solvent.

Shows assembled basic structure.

Basic Structure on Gator Foam Board.

Nearly finished model with loading docks, signage. Beginning to add basic detail parts, not all included with the kit. Structure is finished until installed on layout were ground texture will be applied.
Notes: Main stumbling point with the kit would be the foundation. Although it has nice scribed field stones, the coroners and ends leave a lot to be desired. Foundation could be covered with brick or masonry paper to hide seems, Also it is impossible to keep both the structure and the foundation square enough so that they line up at completion. It would have been easier to construct the foundation to match the foundation, near completion of the kits. (comments concerning this were forwarded to Art Fahie)
Last photos the Fos Scale Models relief structure. Mine turned out to be The Boston Candy Co. Ltd. Basic Directions were followed, windows all received some kind of treatment such as shades, partially opened, Etc.
Again Americana Forrest Green was dry brushed over Dr. Bens Driftwood Stain.
My major "Rail Fanning Trip" is put on hold for this year, as I will be attending the "New" Craftsman Structure Show in Mansfield Mass on November 2nd & 3rd. I will be attending all of the clinics offered and as an early registrant will be participating in several of them hands on.
Being the first of this kind gathering, I look forward to learning various skills and techniques that I can come back and share with all of you.

Bob Chase

10/02/2007

Summer Isn't Over Yet!

From John Camerota..... Ontario Central 418 and LAL 420 sun themselves in Lakeville, NY
LAL heavyweight observation car "Traveller" and LAL #420 in Lakeville, NY.

From Gary Knapp.........

It's June 15, 2006 and I've spent the night here at LaPocatierre, Quebec aspiring towards night photos of trains passing the classic station. Very quiet at night, a couple trains passed by, enough to keep me happy. The white school bus marked with the red CN noodle appearred around 03:00, pulling up and stopping behind the station to deliver members of a section gang to their nearby machines. Various autos arrived shortly therafter, filling up the small parking lot around the station with more section gang members. It was quiet no longer. While most of the track machines were on the passing siding west of town, a pair of tie handlers and tampers were on the short siding immediately to my left. Once their machines were up and running, it did'nt take long before the men came over to talk. I explained I was waiting for VIA #15, and they inquired of a foreman, who told me 308 had to go by first, then the VIA would come west after meeting 308. So we relaxed and tried to maintain conversations, me not speaking french, and many of them speaking broken English at best. 308 came and went. The men explained the gang numbered fifty operators, (Wow! I thought, the track work this gang can do in a day..........) with most members west of town in the passing siding waiting with the rest of us, fo the VIA. Twenty, thirty min. pass by, I'm concerned as the sky starts to lighten behind the station. A couple of gang members ask me if I'm a "spy" for CN, I laugh.....nobody else does. I explain to them I am retired, "no more work" as the sky continues to lighten, I break out my AARP cards which seems to satisfy them. More cigarettes are lit up and more joking in french........it was then that I turned around and saw this! A bonafide sunrise! I check the scanner, still no VIA! Jeez, I thought, you gotta be kidding me, they gonna be late for this! You DO NOT "chase" a VIA train into a sunrise like this, you just have to be in the right place at the right time. I show the sectionmen the image of the station and sunrise on the camera lcd monitor and ask, where is the VIA? They shrug their shoulders, don't know? Then a new voice is added to the talk, I look around and spot the foreman in the white hard hat, below us across the tracks waving at me. VIA he yells, VIA, and points north. I smile and wave a thank you, and drink in the scene before me, as the sectionmen head across the mainline to their machines. The long awaited message comes from the detector a mile and half north of me, in french, but I get the idea, lol! I'm all smiles! I do a quick look around, the gang members, some on the ground next to their machines, some in the cab, watching intently. The flash units are all working. What a backdrop! Then the headlight appears, slowly swinging around the sweeping curve north of the station, and down the straightaway comes the head end of VIA 15. Now I'm thinking he's doing maybe thirty or forty mph, with a fifty man track gang trackside in front of them, and I'm watching thru the viewfinder trying to judge his speed, as the head end comes up past the station, when it dawns on me, holy cow! He's doing track speed! "Click" I "attempt" a wave as the cab of 6413 blows past in a blur, going "real fast", lol! That's all I could think was "real fast"! I wore a smile back to Rivierre-du-Loup and to sleep. The implication of speed is in this photo, in the ballast dust enveloping the rennaisance cars and the exhaust from three F40's flattened down over the train.
Saturday night was very quiet on the D&H "North End", somewhat typical for Saturday nights lately. So, with the work train and rail gang tied up for the weekend, and sunny skies forecast, I was hopeful for a late running southbound to shoot here along Lake Champlains' Willsboro Bay. CP 930 followed 252 out of Canada, arriving Rouses Point around 01:30ish, and I was all ears as the Canadian Crew requested a change to the lead unit on the TGBO.......to the CN 5560! Thus removing one of two big hurdles to overcome in getting a shot at M.P. 144.6, getting a "photogenic" leader and sunny skies. I listened from the compound in Hinesburg as 252 continued south, running through with a D&H crew after passing it's customs check. Then silence after 930 pulled through customs after 01:45 or so. At 03:00 I left the compound and drove ovah to New York, arriving in Willsboro at 05:10 or so. With sunrise due at 06:40, I stopped at the convenience store for a "health food pick me up" in the Doritos' rack, parking trackside in hopes of hearing something on the scanner of 930 coming south. Nothing by just after 06:00, so I started the hike in, knowing I had those two big hurdles out of the way, what the heck! 930 is bound to run this morning sometime. Watching my step walking up the tracks, (there are spots here, right off the ballast, where it's a long drop straight down onto rocks) every now and then I would hear this "whoosh" sound nearby, (like when you close an in-house vacuum outlet), I would stop and look around and see nothing unusual. Then it dawned on me, I was hearing Peregrine Falcons who live here in the cliffs, diving past me hunting for breakfast! At 06:40 I'm finishing the short climb up to my perch here from trackside, not a cloud in the sky and I hear a whistle! From the north, it's gotta be 930! Amazed that my scanner picked up no warning from the two detectors north of me. I look across at the Green Mountains, and the sun is not up yet! What do yah mean 06:40 for sunrise! LOL! It will be 07:00 before the sun has cleared the Greens, as I happily keep an eye on the ever improving light, fingers crossed. Hmmm, maybe the weather service meant 06:40 on the EAST side of VT. Six minutes after sunrise, CN 5560 pokes it's freshly painted nose out of the Willsboro Tunnel Portal, and I'm all smiles! I give the crew a wave as they pull towards me and look through the viewfinder to........"click", and the head end is by me, pulling hard on this southbound grade. Well done guys......Thank You! Shot on Sept. 23, 2007 at 07:07 with the 5D, (ISO 200 & 1/500th) and Leicas' 21-35 zoom set at 23mm and f3.5. Please notice the fisherman in his boat down in front of us here, for an "appreciation" of our postion above him......... please enjoy!

From John"Cully"Cullinan.......

D&H 7303 interchanging with the Battenkill RR in Eagle Bridge, NY.

D&H SCR heading west over the Hudson River Bridge in Mechanicville returning from Eagle Bridge.

D&H Train 414 heading towards Albany over the Erie Canal in Waterford.

9/21/2007

Deano's Summer Vacation!

Dean J. Splittgerber, Jr. .........


Dad Sponsored the Doobie Bros. Alethea and I got to meet them. I got to loose some weight for the Doobie Brothers....Deano Cool tractor trailer at http://www.spitzies.com/

Old Switcher for Railex in Rotterdam.
New switcher for Railex in Rotterdam.
Produce Train. Only time this unit has been on this train. Westbound at Tribes Hill. Lehigh Valley tugboat...restored...Port of Albany during the Tugboat Round-Up. There are only two LV Tugs left. It has and EMD Prime MoverFinally, the new basement for the model railroad. Someday Lincoln Logs will bring the house, LOL!


9/18/2007

Update Summer Vacation Series

From John Camerota..... NS 9034 in the lead of a westbound empty coal train, Alleghany Yard in Olean, NY

From Brad Peterson...
The crossing with my whole train in tow. Once I had some ties in place, I loaded the flat car with supplies and was able to use it as a seat for spiking/gauging. I'm using exterior drywall screws with a washer added to secure the rail to PT 2X4's. This will work great until the extension cords run short. Just kidding, I have a cordless that works fine. Looking east with the deck in the background.

From Tony Bucca.....
Work is progressing on the caboose at King's Station. At our work party last night , we unloaded the 1/4 inch steel gutters we had made up to weld to the edges of the roof. I took a trip all the way down to exit 11 of the northway to measure some things on the 35702-the ex-D&H caboose that's an ice-cream stand. It has v-groove bead-board siding, and we'll be able to match the dimensions very closely. We have been scrapping the roof of the aluminum
coating, and we should be able to get the gutters welded in place this week. Then we'll peel the first layer of plywood to determine if the primary layer is going to be OK as a substrate for the bead-board. Landscaping is ongoing, and I hope to bring in some ballast for around the ties. As always,photo documentation is ongoing. We are very lucky to have a number of non-rail citizens involved in the project, just for the historical side of it. But that's part of the Bridge Line Historical Society! Thanks to C.R.O.C.K.S. (Citizens Restoring Our Caboose at King Station,) progress has been made on our work on the caboose. We went before the town of Greenfield board with our work and schedule plans, and they not only approved our estimated budget, but increased it by about 25%. Our town supervisor, Al Janik wants to make sure things are done the right way. We've had a couple of work sesions, initially to clear overgrown shrubbery, and pull up buried brick pavers, in anticipation of engraved pavers we hope to sell for between the depot and the caboose. Work on the caboose began in earnest with a good cleaning of the inside. On a subsequent work-day we drilled out the screws securing the roof-walks so we could have a clear shot at re-doing the gutters and roofing. The caboose has TWO layers of plywood sheathing, the second extending past the edge of the roof-line, allowing for water infiltration. We, as a comittee have decided to strip both layers down to the frame-work, and re-do the siding in a more aesthetic bead-board as early cabooses had. While I was in Cass,WV, I was able to get some detail shots of some of their wood-side cabeese. The general good shape of the metal roof will allow us to divert monies ear-marked for roofing to the slightly more expensive bead-board. We plan on doing a side at a time,but not till after we have welded on new gutters. Thanks to BLHS historian Brad Peterson for keeping an eye on the caboose as he passes by each day, and to Bill Bibby who also wants to get involved from North Creek. I will be presenting a Power-point presentation at the BLHS convention in October, so I have been keeping a photographic record of progress to date.

9/10/2007

My Summer Vacation Series

From Bill Kozel...
Not exactly what I would choose to post but....Go to:http://conradstenton.multiply.com/photos/album/207/Quebec_Northshore_Labrador_Run
here are some pic's someone on the trip did post.
As you can see, we had some rain, typical for Labrador and it was definitely cold all of the time, 30's to 50. It snowed just north of Mai before we got their.
I will be writing an article for the D&H Bridge Line for next issue. I wasn't able to send in a column for the current issue, just plain ran out of time. Hopefully the guy will send more pic's of the trains and facilities. I definitely will make a video of this run.
The loaded ore trains are 240 cars with two units leading and one mid train now. Wabush Mines (Mines Wabush in French/Canadian) are behind the helper and hauled for the Wabush mine. Many things had changed on the railroad since my last trip just prior to 9/11.
The labor problems I was told the railroad had were actually problems the mine workers had with the mine management itself which would affect the railroad by ore haulage but did not relate to the railroad in any other way; the railroad did not have labor problems as we had been informed so our trip was never in jeopardy.
Got 11 hours sleep last night, finally feel awake after two weeks, haha! These "mainline" trips are definitely not relaxing. Really happy I could get one of my partners & fellow BLHS member Bill O'Connell (alias General Patton, alias Sheepskin) on the trip.
Regards, Bill K

From John Camerota....Thermite Weld at the end of its pour. WNYP RR near MP43.75. Rail is132RE. This is part of a larger track rehab project including tiereplacemt and surfacing as well. 8/22/2007, 1618HRS....... Westbound CSXT vans pass CP 5 in Lackawanna. In the near future thistrain may make pick ups and setouts here. Seneca Yard on the left isbeing regraded and reconfigured to serve the growing intermodal marketin the Buffalo Niagara area. 8/24/2007 1231HRS............. John C

From Randy Epstein....
I took this picture the other day on my layout. Both of the NYC Atlas GP40's were from Alex's collection, purchased from Paul's. I hope Alex would have approved.
Randy E
From Brad Peterson...
The new deck, or should I call it the log unloading platform. Through the sliding glass doors is the woodburning stove and this 1 1/2" gauge railroad will be used to get from the wood pile to the stove this winter.Looking west from the deck is the first 30' off the20' deck. This includes a small crossing for the kids to get from the pool to the deck without jumping over the tracks. Its the first 50 feet done in July.Turned around from the last shot is the 'S' curve to get across the gully next to the driveway. The wood pile will be in the driveway turnaround just beyond the sub roadbed. The tracks will enter the woods and head for the mailbox. Brad P........

6/15/2007

Gary Knapp Night Photographer

Advertised as the steepest portion of CSX' Mountain Subs' Cranberry Grade, at 2.84%, the aptly named Graveyard Curve forms the middle of a tight horseshoe curve east of Rodamer,W.VA. The graveyard contains headstones dating to the mid 1800's, (the stones I could read) and is reported to be the burial ground for many of the Irish immigrants who died while laboring to build this railroad through the West Virginia mountains. Reading the dates on the headstones, it's obvious life was much more precarious back in the mid 1800's. While the view looking downgrade at track level is impressive, this is, after all, Graveyard Curve, so up into the graveyard I went. What a view! The only lights to be seen at night are the stars & moon. No orbs of light or ghosts drifting by, (no ghosts on the camera lcd monitor either.....thankfully). I did draw an owl in, with all the test flashes, landing overhead and suddenly "hooting". The CSX "Curved Track Gang" was working on Cranberry during the time I was here, and they had just laid new CWR and tie plates on the near main. While you hear eastbounds laboring uphill forever before they pass by, the only warning of a westbound is a whistle up in Terra Alta, then in a couple of minutes, the headlight starts to silently light up the area beyond the curve here, and the quiet running GE's come down around the curve at maybe 15 mph. The 2.84% grade is certainly evident in this view. CSX 234 was shot at 03:58 on May 24, 2007 with the 5D, and Canons' 90/2.8 t/s lens, set at f2.8 with small amount of tilt down. Photo was cropped slightly from the 90mm view. From the platform in front of Point Of Rocks Station, here is the new look in CSX paint schemes, worn by a brand new ES44DC, the 5410. What a setting for a train to pass in front of! Shot on May 26, 2007 at 00:49 with the 5D, and Canons' 100/2 lens set at f2!

I settled into the area around Brunswick, Maryland on May 25th. While at Point Of Rocks Station that evening, I saw two "Rock Runners" pass by eastbound, so I thought this would be a good opportunity to shoot one of them returning west here on the Winchester Sub at Harpers Ferry. After a four to five hour wait I was rewarded with the appearance of GP 38-2 2540. I attempted this same photo last year when visiting this location, and was not happy with the results. This is a very deceptive location to photograph a train on the trestle at night in. The tree throws a shadow across the long hood of the locomotive that you must deal with. I was much happier with the results from this visit on May 25th. See what you think. Shot with Canons' 5D and 90/2.8 t/s lens, tilted down one mark, set at f2.8, at 02:28. Flash units erased in ps that were in the alley and along the trestle. This photo was taken at Oakland, with the added enhancement of fog rolling in, I was fortunate to catch CSX 297 leading another westbound train of coal empties past the restored station. I spoke with one man when I was setting up here around 21:00, walking home with a six pack under his arm, and that was it all night. What a scene! A couple of eastbound loaded coal trains had rolled by in the intervening hours between photos, so I'm sure this westbound crew had been told of a night photo set-up here. I like this view looking through Canons' 100/2 lens. More impact. In processing, I have removed overhead wires and a flash unit on the platform just ahead of the plow of the 297. Shot on May 19, 2007 at 03:33 with Canons' great achievement, the 5D, (ISO 1600 & 1/200th). Please enjoy, comments are welcomed.

Gary

6/10/2007

Summertime Fun?

Here's about half of my model railroad, maybe I should open a hobby shop instead!
Bill Kozel

5/21/2007

Rob Dennis's Shelf Layout

I started a shelf layout over the winter in my apartment. It's two modular pieces, one is 21"x 72, the other is 18"x 72". I am using MRC's DCC Express to run it. The basic concept was taken from Mike Confalcone's Hardwick & Woodbury from Model Railroad Planning 2007. I have a main, a passing siding, two industries to switch, a engine house and a branch line, in this small space. I can always use this layout in a larger home layout when it is finished.







The layout concept is northern Vermont in the Fall of the late 1980's. My short line Central Terminal, interchanges with the Boston & Maine, CP Rail and Maine Central in St Johnsbury, VT.
I have D&H Alco's on lease for the branch line. They will have a nice little red engine house to call home. A lumber at one end and a planning mill at the other end. This shelf layout will be a science project of testing new products and techniques for me also. I will post updates as scenery continues.....

5/08/2007

Updated Southern Adirondack Railroad

Brad Peterson sent recent updates on his layout for all to see, work continues and the layout grows and starts to take shape, enjoy - Rob D
North end D&H yard / west end B&M yard. The B&M yard consists of 5 tracks (from the left) where the D&H mainline then splits the yards with WY Cabin in the center of the picture. On the D&H side is 10 yard tracks total with the engine terminal and wye in the rear right. The mainline ends just beyond the 's' curve at present but will eventually go into a helix and then split at QG to go into both D&H and B&M staging.
This is the recently completed (track work) north end of the Southern Adirondack. Bottom right is my uncovered covered bridge and the future Towle & Son Sand and Gravel siding to go in to the right. The Saratoga Lake public delivery track comes off to the left. The curve will someday see a short version of the trestle that crossed the north end of Saratoga Lake. The bridge across the door is removable and connects to Saratoga yard. The SAR engine house is seen to the left.
Looking across the yards at Mechanicville, the Round Lake Paper Co. Mill 3 is seen at the south end of the SAR with Lamora Cement just across the street. R A Dennis Lumber & Supply is just beyond the double track thru truss bridge then comes my scratch built B&M prototype 'uncovered covered bridge' and the hill toward Saratoga.

This is the start of the Colonie Mainline, BK will be just to the left on the track to the rear. The tight curve was necessary so I could have a decent sized crew room and get the trains through. The scene will be of the 'big fill' in Waterford including the old barge canal at MP A11 and the overhead road bridge just to the south. Washington Ave crossing will be at the switch to Prime Mfg. seen at lower left.
Looking south on the Colonie Main, Mohawk Paper run around, stub, and industry lead. Saratoga & Spring streets will converge just as the industry lead curves toward the building (cars spotted) while including the signals that still protect the prototype crossing today. The Main curves to the left and Norlite siding will come off the main just before the tracks cross the aisle (another removable bridge) and go over the washer and dryer to reach Colonie.