Going through the streets of Ballston Spa. D.A. Collins moved the caboose, started 7am.
Backing into the fairgrounds, around 4pm.
Going through the streets of Ballston Spa. D.A. Collins moved the caboose, started 7am.
Backing into the fairgrounds, around 4pm.
Brad Peterson's Kayaderosseras & Southern Adirondack Railroad. On Sept. 14, 2008 we had a tent set up for shade and a safe work area. Here Rich Veldman has just finished cutting over 200 new ties for the rail that has just arrived. Skip Densing and Bob Hosmer are getting ready to start drilling the rail ends for joint bar installation by Tim Stockwell.
This was my biggest project of the summer, I finally found the hardware for the helix and got it all put up. The upper level (QS cabin and beyond) turned out to be too high, so I still have to get around to lowering things to fit. I also added to the B&M engine shop area in September, though there is really no track installed to speak of.
Nov. 2, 2008 Work Extra D&H 42 gets ready to head south with a full load of stone for the new section of track built since September. Not ready for a picture to be taken.
Final touch up to the ballasting done today is being supervised by Bill Bibby with Tim Stockwell and JR Stevens doing the dirty work. This is the trackage adjacent to the driveway near the culvert.
We are visiting the newly renovated North Stratford, NH station (ex-Grand Trunk) tonight. All decked out for Halloween, the building is the new home for the town library. I'm sure the location provides a good reading atmosphere during the daytime hours, as the only trains pass by late at night. I like the replaced semaphore. The priceless stuffed straw figures accent the lines of the station windows while they turn viewers attention toward the power. Plus they are free models! I got away with moving one down to this end, and did'nt push my luck any further! LOL! This location was among legendary photographer Phil Hastings favorite destinations in the late 1940's, a superb Hastings photo of the MEC conductor signing the register book from inside the bay windowed operator's room is in Ron Johnson's "Maine Central Railroad, Mountain Division". Sixty or more years later, the light ten wheelers and their mixed trains that captured Phil's creative mind are long gone, but the railroad remains in a more modernized state as the New Hampshire Central curving away from the SLR main behind the 804 in this scene. Tonight's train 393 is led by road slug 804, with a trio of orange & black brothers trailing. Shot on Oct. 11, 2008 at 02:17 with the 5D, and Nikkor 14-24 lens set at f2.8 and 15mm. I'm ecstatic over the new lens's performance here at f2.8 with sharpness out to the right bottom edge! "Much lighter processing used here also, having learned something (hopefully) from the last attempts at processing the daylight photo from Willsboro. Please enjoy! Comments are welcomed.
Joe Merli didn’t quite know what to do with the 1950s-era, General Motors-built E-8 passenger locomotive, but knew he couldn’t allow the 60-ton steel beast go to the scrap yard, the Schenectady Daily Gazette reports.
Article from Chris and pics by Deano!!!!!
We often overlook the work that goes into keeping a railroad running. John spent his summer helping rebuild the tourist and freight line, Arcade & Attica, with your tax dollars. Money well spent as far as I'm concerned! The dramatic night shot above is the night time replacement of the main street crossing in Arcade, NY.
The"bread and butter" of the A&A sit outside the Arcade shops, getting ready for a new day. A couple of Alco's chug up hill above the little town of Roberts Bank.
A long freight headed by a Geep 30, glides downhill under tale tails near the town of Onderdonk.
Onto to the new stuff, above the work bench, a new industrial area will be built.
Wrapping around the walls 18" deep above the work benches a main and passing siding will head to hidden and open staging.
We see the open staging yard, behind the door to the train room. Bob moved the display cabinets under the bench work.
Channel 13 hires freelance mobile TV cameraman ( Tony Bucca) at the east portal last Friday, chasing the Pan Am slurry train. Cully says,"I didn't mean to wake him up, he was "oogling" the female kayakers and rafters. He claims the van has all the comforts of home, but it seems to be missing a "bidet". Caught him fluffing his pillow and warned him about the approaching slurry train!".
VRS 301-303 at North Hoosick Bridge with slurry train
.
Pan Am 380 with the slurry train through Zoar, MA.
The Second shows the yard nearly completed. Once completed the tracks will be adjusted so they are all straight. If you look closely you can see the jumper wires for the tracks.
The third is the beginning of the logging line that will run through the mountain When the initial logging line is built it will have 4 switchbacks.
The fourth is a close up of the approximate location of the trestle bridge for the logging line. The bridge was on my previous layout for the logging line. This bridge was built from a 2x4. The 2x4 was cut down on a large table saw then cut to size on my hobby table saw. The ties on the bridge were leftovers from the large trestle bridge that I built on my previous layout.
This is part of the mountain that is located over the second railroad yard. You can see the location of some of the switchbacks for the logging line and a small river bed next to the 2 main lines. Each section of the mountain is constructed to be modular, with sections overlapping at the joints of each module. Plastic is placed between the overlapping sections so they do not stick together.
Both main lines are up and running. Each has been tested with up to an 80 car freight. The main lines have been wired for half of the layout. On the section that is wires the train runs at a steady pace. Jumpers are places approximately every 6 foot. On the section that is not wired yet the trains slow down due to voltage drop. The section that is wired has been calculated to have a voltage drop of only 1/4 volt with 4 diesel locomotives drawing 1/2 amp each. The wire size I used to achieve this is #10 AWG. That is the same size of wire used for household dryers. The jumpers to the track are #16 AWG stranded wire (speaker wire).The DCC power pack has an output of 3.5 amps at 18 volts AC. We have had up to 5 power units running at the same time without any speed lose on the wired half of the layout. I will send you more photos later. We should have the logging line up and running by October.
Mark
Please enjoy the attached photo. August continues to be a most enjoyable month this year! First the TRAINS magazine article, now NECR detours over VRS powered by solid sets of blue & yellow GP 38's! It's been "a long time" since I have seen a solid set of NECR power on anything. So with thanks to Scott Whitney for the original heads up on Monday evening, I had my plans for week changed. Thankfully, I was in a position to drop everything for this event. The detours lasted three days/nights into Thursday morning. The first two nights became recon patrols, visiting favourite photo locations ahead of the detour, only to notice "something's wrong here"......the scene had changed for the worse, LOL! Knowing I had a third chance Wednesday night I was laughing it off when I arrived well ahead of NECR 324 at Bartonsville Covered Bridge Tuesday evening only to find one of those refrigerated box trucks parked alongside the tracks smack dab in the scene facing me! What else can you do? Wednesday evening came and armed with the knowledge that NECR 323 (the final detour) would be arriving in Bellows Falls around 18:00, I drove down to East Wallingford to where my friend Helen Fox has lived since she was eight. After knocking at the door and reaquainting ourselves at dusk, ( thankfully I remembered her name.....) I proceeded to set up and wait. With plenty of time to time to get the lighting to my satisfaction it was a couple hours before I broke out the thermos of green tea, as this is a deceiving location to light up a train at night. We're deep in Vermont here, quiet descends after dark in hill farm country, one of which is located above the tree line to the right of the photo, contributing wafts of manure odors on breezes through the night. Note the tire swing up in the tree. While I set up a family comes down to the end of their driveway behind me here to watch, hoping to see the train, one of the kids asks a parent..........."he's gonna park his car there"? Little does she realize, having delivered me here, now the "cah" is the least of my concerns, LOL! Another car arrives and conversations ensue. By eleven p.m. my tired audience disperses, disappointed. Most of the neighbors lights stay on though, as they've seen my act here before enough to stay up for the train. When I shot the P&W Johnson City coal train here, I met Mrs. Fox and told her of my plans, only to be admonished that "there are no trains here at night". On any other night Helen would have been correct! To her credit she allowed me to set-up around her house anyway that night. It was after eleven p.m. when the VRS dispatcher in Rutland broke the silence, calling the NECR 3849! Bringing a wide grin to Gary's face! A half hour later I hear an airhorn towards Mount Holly, the NECR GP 38's ARE NOT equipped with dynamic brakes, so you cannot hear them coming downgrade that well. Almost another half hour goes by as the head end closes in. It's just before midnight, as the moment is savored, NECR 3849 leads three sisters around the curve and past me at 10 mph, making it easy to pick the spot I want the head end in. A sight I have'nt seen in years, four NECR GP 38's together! WOW! Worth waiting hours for. Before departing in a glow, I shared the photo with Helen Fox, thanking her for her hospitality. What a location. eh!? Please enjoy! Comments are welcomed. Shot on August 13, 2008 at 23:59 with the 5D and Zeiss ZF 28/2 (Nikon) set at f2. Flash units erased in photoshop behind the pilot of 3849 and in front of the tree.